Commercial/Industrial (C/I) Rebate Program

Prescriptive Rebates:  Following is a list of the major types of equipment and services available for prescriptive rebates under the C/I Rebate program:

 

Equipment or Service

Rated

Rebate

Gas Furnace

Greater than or equal to 92% but less than 94% AFUE

$200

Gas Furnace

Greater than or equal to 94% AFUE

$250

Electronic programmable setback thermostat

Energy Star

$40

Continuous modulating burner

Burner replacement considered efficiency improvement.

25% of equipment cost or $15,000 per burner, whichever is lower

Gas-fired boiler tune up
Non-Profit Customers

Submit combustion test results performed before and after tune up. Eligible for tune up every two years.

75% of the cost up to $750 per boiler, whichever is lower

Gas-fired boiler tune up
All other C/I customers

Submit combustion test results performed before and after tune up. Eligible for tune up every two years.

50% of the cost up to $500 per boiler, whichever is lower

Steam trap replacement. Maximum of 25 failing units per program year

Steam trap replacement considered efficiency improvement.

50% of the equipment cost or $2,500 total, whichever is lower

Vent damper

Damper installation considered efficiency improvement.

50% of equipment cost or $500 cap per boiler, whichever is lower

Primary air damper

Damper installation considered efficiency improvement.

50% of equipment cost or $500 cap per boiler, whichever is lower

Food service gas steamer

Energy Star qualified

50% of equipment cost or $475, whichever is lower

Food service gas fryer

Energy Star qualified

50% of equipment cost or $350, whichever is lower

Food service griddle
Top and bottom surfaces of clamshell models must be gas

Energy Star qualified

50% of equipment cost or $400, whichever is lower

Food service gas convection gas oven

Energy Star qualified

50% of equipment cost or $200, whichever is lower

Kitchen low flow spray wash nozzle. Maximum of 2 nozzles.

GPM rating of 1.6 or less

50% of equipment cost or $100 per nozzle, whichever is lower

*Annual Fuel Utilization Efficiency


You can apply on-line by clicking here, or download the following forms: 

Application Form
Go back to main content | Go back to main navigation

Footer Navigation

Footer Utility Navigation

Copyright © 2008 Laclede Gas Company      All rights reserved.

Appliance Sales
Go back to main content Go back to main navigation